MacDonald Mines Recommences Drilling Program on 5 Project Areas in Ring of Fire; Employs Advanced Modeling Process of Targets

MacDonald Mines Exploration Ltd. (TSX VENTURE:BMK) ("MacDonald” or the "Company") is pleased to announce it has re-commenced it’s 2008 drill program

MacDonald Mines Exploration Ltd. (TSX VENTURE:BMK) ("MacDonald” or the "Company") is pleased to announce it has re-commenced it’s 2008 drill program, focusing on multiple priority geophysically defined targets across five project areas in the “Ring of Fire” District of the James Bay Lowlands. The drill program will operate through to the end of October 2008, with approximately 40 holes and approximately 8,000 metres drilled by program end.

The drill program was paused at Labour Day weekend in order to give drill and camp personnel a much-needed rest and catch up on core logging and sampling.  Core from August drilling has been sent to the labs for analysis.

Drill Location Update

Drilling began, and is still ongoing, on MacDonald’s 100% owned McNugget Property. The drill is scheduled to move to the next project zone as early as next week once remaining targets have been drilled.  The next project zone will be “Wellington”. The Company has agreed to rent the Fish Basket Camp from the Summer Beaver First Nations, and will utilize this facility as a base camp for exploration on the Wellington Property. A number of high priority targets have been defined and modeled, and ready for drill testing.

Advanced Modeling Process Now Being Employed

MacDonald Mines has now fully engaged the use of an advanced modeling process that will allow the Company to identify, prioritize and drill targets without employing traditional ground geophysics. The benefits of this new modeling process are significant to MacDonald’s exploration process, as it now allows the Company to efficiently locate targets at greater depths, with improved accuracy, clarity and at significantly reduced costs.

Since employing the new computer modeling techniques, the Company has seen a dramatic increase in the percentage of successful “hits” of mineralization on the most recent holes drilled, intersecting more sulphides then the past and at greater depths.  Through this modeling process, the Company has been able to verify the conductive source of its targets in every instance.

Bill Nielsen, P.Geo, is the designated qualified person for the technical information contained in this press release.

For more information, please contact


Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Website: www.macdonaldmines.com/
(800) 818-5442
(416) 364-4986
(416) 364-2753 (FAX)

Brent Nykoliation  
Director, Business Development
J. A. Kirk McKinnon 
President and CEO
Richard Schler
Vice President & CFO

WARNING: The statements made in this news release may contain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from expectations and projections set out herein.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this news release.